construction photos

3

studwork for upper floors viewed from hall/dining (as per plans) up towards bedroom 2 and loft space

6

original level of the ground floor of the main body of the Old Chapel. The floor boards have just been taken up. Location in building : kitchen in foreground, bathroom and then bedroom 1 in background

7

the portion of the building known as the workshop or the schoolroom/ annex /garage. (MDC wanted to make the building a metal workshop and Dad persuaded them it was worth saving). These are the original windows, and the replacement windows made by Dad can be viewed here

5

in the foundations

4

looking down onto groundfloor’s bathroom and bedroom 1 behind. Steel angle on the wall for flooring joists

 

Terry in the foundations of the Old Chapel

Terry in the foundations of the Old Chapel

10

new floor going into the studio on the first floor of the main body of the Old Chapel

9

foundations just inside the main door of the Old Chapel

Scan

studwork for the 2 bedrooms on 1st floor and for the loft space within the Old Chapel

Scan1

The structural beam supporting the 1st floor (inside main body of the Old Chapel) being jacked into place

Scan2

ground floor inside main body of the Old Chapel. See plans : bedroom 1 on RHS living room on LHS

Scan10002

First floor structural beam in position! (The beam came from the Tannery).