original front door being cleaned up. Notice please it is sitting on new concrete floor of workshop. Step up into house part
polystyrene laid under new floor in main body of Chapel. The church floor boards were discarded because rotted, these supports were re-used in the stair banister and the banister along the edge of the studio
in the workshop, original front doors being refurbished
the arched shape is where the hymn numbers used to be displayed.
Terry in studio on first floor, banister reclaimed timber
the cat used to sleep on top of the bathroom on the 1st floor: this panelling of the “tardis” bathroom is reused from the old entrance lobby
Old Chapel’s original panelling of entrance lobby to church